Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0237 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,275 | $177 | Not Implemented |
IC0237 # 06 Y:2020 | 06 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $817 | $1,111 | Not Implemented |
IC0237 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $628 | $200 | Not Implemented |
CL2006 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,598 | $51,573 | Implemented |
CL2006 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,133 | $4,500 | Implemented |
CL2006 # 03 Y:2020 | 03 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $7,541 | $1,000 | Not Implemented |
CL2006 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,769 | $12,768 | Not Implemented |
CL2006 # 05 Y:2020 | 05 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,314 | $3,400 | Implemented |
TR0024 # 01 Y:2020 | 01 | 2020 | MAINTAIN MACHINES TO REDUCE LEAKS | $402 | $576 | Not Implemented |
TR0024 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $889 | $1,131 | Not Implemented |
TR0024 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $400 | $767 | Not Implemented |
TR0024 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $154 | $100 | Not Implemented |
TR0024 # 05 Y:2020 | 05 | 2020 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $4,527 | $10,313 | Not Implemented |
TT0237 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,248 | $3,360 | Implemented |
TT0237 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,481 | $13,500 | Not Implemented |
TT0237 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,785 | $4,720 | Not Implemented |
TT0237 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,403 | $33,173 | Implemented |
TT0237 # 05 Y:2020 | 05 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $11,220 | $20 | Implemented |
TT0237 # 06 Y:2020 | 06 | 2020 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $6,985 | $480 | Not Implemented |
TT0237 # 07 Y:2020 | 07 | 2020 | METER WASTE WATER | $6,876 | $2,000 | Implemented |
TT0237 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,445 | $0 | Implemented |
TT0237 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,896 | $10 | Implemented |
TT0237 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $760 | Implemented |
TT0237 # 11 Y:2020 | 11 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $339 | $653 | Not Implemented |
LE0494 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $3,038 | $1,620 | Implemented |