IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented
WI0523 # 04 Y:2006 04 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0523 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,735 $800 Not Implemented
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
WI0522 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,304 $182,880 Implemented
WI0522 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $14,000 $3,000 Implemented
WI0522 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,607 $2,000 Implemented
WI0522 # 04 Y:2006 04 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,457 $3,000 Not Implemented
WI0522 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,685 $1,920 Implemented
WI0522 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,544 $0 Implemented
WI0522 # 07 Y:2006 07 2006 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,560 $12,105 Not Implemented
WI0521 # 01 Y:2006 01 2006 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $222,888 $230,600 Not Implemented
WI0521 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,408 $13,600 Not Implemented
WI0521 # 03 Y:2006 03 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,900 $18,000 Not Implemented
WI0521 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,386 $11,000 Not Implemented
WI0521 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $3,200 Not Implemented
WI0521 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,035 $500 Not Implemented
WI0521 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $0 Not Implemented
WI0520 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $252,960 $360,000 Not Implemented
WI0520 # 02 Y:2006 02 2006 PAY BILLS ON TIME TO AVOID LATE FEES $37,087 $0 Implemented
WI0520 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,371 $500 Not Implemented
WI0520 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,283 $0 Implemented
WI0520 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,055 $1,845 Not Implemented
WI0520 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $135 $350 Implemented
WI0519 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,942 $17,500 Not Implemented