Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,380
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0058 # 02 Y:1989 | 02 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $280 | $300 | Implemented |
AM0058 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $0 | Not Implemented |
AT0125 # 01 Y:1989 | 01 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $33,982 | $5,000 | Implemented |
AT0125 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,988 | $1,306 | Implemented |
AT0125 # 03 Y:1989 | 03 | 1989 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,395 | $15,000 | Implemented |
AT0125 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,202 | $160 | Implemented |
AT0125 # 05 Y:1989 | 05 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,671 | $5,500 | Implemented |
AT0126 # 01 Y:1989 | 01 | 1989 | CLOSE OFF UNNEEDED STEAM LINES | $3,825 | $5,000 | Not Implemented |
AT0126 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,066 | $10,000 | Implemented |
AT0126 # 03 Y:1989 | 03 | 1989 | INSULATE BARE EQUIPMENT | $5,066 | $10,311 | Implemented |
AT0126 # 04 Y:1989 | 04 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $2,533 | $500 | Implemented |
CO0144 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,650 | $500 | Implemented |
CO0144 # 02 Y:1989 | 02 | 1989 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,253 | $13,500 | Not Implemented |
CO0144 # 03 Y:1989 | 03 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,856 | $1,500 | Implemented |
CO0144 # 04 Y:1989 | 04 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $963 | $0 | Implemented |
CO0144 # 05 Y:1989 | 05 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,949 | $5,481 | Not Implemented |
CO0144 # 06 Y:1989 | 06 | 1989 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,942 | $3,500 | Implemented |
CO0144 # 07 Y:1989 | 07 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $678 | $200 | Implemented |
CO0144 # 08 Y:1989 | 08 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $500 | $450 | Implemented |
CO0144 # 09 Y:1989 | 09 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $214 | $267 | Implemented |
AM0055 # 01 Y:1989 | 01 | 1989 | IMPROVE LUBRICATION PRACTICES | $1,260 | $0 | Not Implemented |
AM0055 # 02 Y:1989 | 02 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $917 | $0 | Not Implemented |
AM0055 # 03 Y:1989 | 03 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $547 | $500 | Implemented |
AM0055 # 04 Y:1989 | 04 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $590 | $1,000 | Implemented |
AM0055 # 05 Y:1989 | 05 | 1989 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $130 | $220 | Implemented |