IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0083 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,358 $325 Implemented
RU0083 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $2,368 Implemented
RU0083 # 03 Y:1990 03 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $51,967 $50,000 Not Implemented
RU0083 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $3,851 $6,100 Implemented
RU0083 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,994 $17,800 Not Implemented
RU0083 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,662 $0 Implemented
RU0083 # 07 Y:1990 07 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,019 $0 Not Implemented
RU0084 # 01 Y:1990 01 1990 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $68,217 $70,000 Implemented
RU0084 # 02 Y:1990 02 1990 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $12,691 $0 Not Implemented
RU0084 # 03 Y:1990 03 1990 USE OPTIMUM THICKNESS INSULATION $4,598 $3,900 Not Implemented
RU0085 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,252 $0 Implemented
RU0085 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,206 $500 Implemented
RU0085 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,262 $10,620 Implemented
RU0085 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,370 $0 Not Implemented
RU0085 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,011 $11,500 Not Implemented
RU0086 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,981 $21,083 Implemented
RU0086 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,121 $0 Implemented
RU0086 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $500 Implemented
RU0086 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,885 $52,895 Implemented
RU0086 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,663 $350 Implemented
RU0086 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $38 Implemented
RU0086 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $17,528 $10,200 Implemented
TN0392 # 01 Y:1990 01 1990 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $258,435 $0 Not Implemented
TN0392 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $5,052 $9,401 Implemented
TN0392 # 03 Y:1990 03 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,222 $4,000 Implemented