Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product HARDWOOD STRIP FLOORING
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $5,000,000-$10,000,000
# of Employees 104
Plant Area (Sq.Ft.) 0
Annual Production 7,500 Thousand Feet
Production Hrs. Annual 2,168
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $373,454 6,600,235 kWh $0.06
Wood $112,000 137,600 MMBtu $0.81
TOTAL ENERGY COSTS $485,454
RECOMMENDED SAVINGS* $314,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,154
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$258,435
Cost:
-
$258,435 4,582,356 - - - - $258,435
4,582,356
kWh
-
-
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,052
Cost:
$9,401
- - $5,052 6,496 - - -
-
kWh
$5,052
6,496
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,222
Cost:
$4,000
- - $2,222 2,857 - - -
-
kWh
$2,222
2,857
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$12,329
Cost:
-
$12,329 216,295 - - - - $12,329
216,295
kWh
-
-
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$524
Cost:
$2,000
- - $524 674 - - -
-
kWh
$524
674
MMBtu
-
-
$
06: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE Savings:
$10,842
Cost:
$4,670
$10,842 190,211 - - - - $10,842
190,211
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,374
Cost:
$1,000
$10,374 182,005 - - - - $10,374
182,005
kWh
-
-
MMBtu
-
-
$
08: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$6,631
Cost:
$9,913
$6,251 108,441 - - $380 - $6,251
108,441
kWh
-
-
MMBtu
$380
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,692
Cost:
$2,250
$3,692 64,771 - - - - $3,692
64,771
kWh
-
-
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,859
Cost:
$760
$2,859 42,204 - - - - $2,859
42,204
kWh
-
-
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$952
Cost:
$490
$952 16,706 - - - - $952
16,706
kWh
-
-
MMBtu
-
-
$
12: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$451
Cost:
$1,740
$451 7,913 - - - - $451
7,913
kWh
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$343
Cost:
$289
$343 5,862 - - - - $343
5,862
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$314,706
Cost:
$36,513
$306,528 5,416,764 $7,798 10,027 $380 - $306,528
5,416,764
kWh
$7,798
10,027
MMBtu
$380
-
$
TOTAL IMPLEMENTED Savings:
$45,154
Cost:
$22,321
$37,356 647,421 $7,798 10,027 - - $37,356
647,421
kWh
$7,798
10,027
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes