IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0313 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $6,519 $720 Implemented
MI0313 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,171 $1,160 Implemented
MI0313 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,626 $4,300 Not Implemented
MI0313 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,803 $1,580 Not Implemented
MI0313 # 06 Y:2017 06 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,082 $249 Implemented
MI0313 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $3,884 Not Implemented
MI0313 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $992 $1,660 Implemented
MI0313 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $164 $574 Implemented
CL1701 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,942 $10,000 Implemented
CL1701 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $18,050 $250 Not Implemented
CL1701 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $12,535 $3,650 Implemented
CL1701 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,647 $22,515 Implemented
CL1701 # 05 Y:2017 05 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $5,838 $13,500 Implemented
CL1701 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,382 $6,000 Not Implemented
DL0176 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,570 $0 Not Implemented
DL0176 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,117 $0 Implemented
DL0176 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,480 $1,690 Not Implemented
DL0176 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,930 $2,190 Not Implemented
DL0176 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,415 $16,875 Not Implemented
DL0176 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,410 $4,465 Implemented
DL0176 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,798 $4,484 Implemented
DL0176 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,869 $2,965 Implemented
DL0176 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $880 $800 Not Implemented
DL0176 # 10 Y:2017 10 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,330 $6,700 Not Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented