Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28,089
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0953 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,558 | $8,050 | Implemented |
GT0953 # 06 Y:2020 | 06 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $38,010 | $172,500 | Implemented |
UF0558 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,597 | $19,045 | Implemented |
UF0558 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $456 | Implemented |
UF0558 # 03 Y:2020 | 03 | 2020 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $42,983 | $7,127 | Implemented |
UF0558 # 04 Y:2020 | 04 | 2020 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $1,517,489 | $143,275 | Implemented |
UF0558 # 05 Y:2020 | 05 | 2020 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $40,098 | $110,800 | Implemented |
UU0179 # 01 Y:2021 | 01 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $72,600 | $4,000 | Not Implemented |
UU0179 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $27,935 | $2,000 | Implemented |
UU0179 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,891 | $1,233 | Not Implemented |
UU0179 # 04 Y:2021 | 04 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,472 | $8,300 | Not Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |
UU0179 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $6,614 | Implemented |
UU0179 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $617 | $50 | Not Implemented |
UU0179 # 08 Y:2021 | 08 | 2021 | INSULATE BARE EQUIPMENT | $345 | $747 | Not Implemented |
MI0381 # 01 Y:2020 | 01 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,304 | $57,960 | Not Implemented |
MI0381 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,914 | $860 | Implemented |
MI0381 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,145 | $2,400 | Not Implemented |
MI0381 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,241 | $555 | Implemented |
MI0381 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,735 | $980 | Implemented |
MI0381 # 06 Y:2020 | 06 | 2020 | KEEP BOILER TUBES CLEAN | $2,320 | $3,500 | Not Implemented |
MI0381 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,688 | $4,905 | Implemented |
SU0501 # 01 Y:2020 | 01 | 2020 | ELIMINATE/REDUCE AN OPERATION | $557 | $20 | Not Implemented |
SU0501 # 02 Y:2020 | 02 | 2020 | DISCONNECT BALLASTS | $919 | $180 | Not Implemented |
SU0501 # 03 Y:2020 | 03 | 2020 | ELIMINATE/REDUCE AN OPERATION | $2,583 | $2,772 | Not Implemented |