IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0017 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,880 $314 Implemented
UA0017 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,989 $0 Implemented
UA0016 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,322 $10,000 Implemented
UA0016 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,023 $20,000 Not Implemented
UA0016 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,135 $2,000 Not Implemented
UA0016 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $171,000 $95,000 Not Implemented
UA0016 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,808 $460 Not Implemented
UA0016 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $30,000 $50,000 Not Implemented
UA0016 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,000 $150,000 Not Implemented
UA0014 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $0 Implemented
UA0014 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,143 $1,040 Implemented
UA0014 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented
UA0014 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $5,800 $14,850 Not Implemented
UA0014 # 05 Y:2008 05 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,454 $591 Implemented
UA0014 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,520 Not Implemented
UA0014 # 07 Y:2008 07 2008 SHUT OFF PILOTS IN STANDBY EQUIPMENT $457 $72 Implemented
UA0014 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $1,164 Not Implemented
UA0014 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $2,288 $770 Not Implemented
UA0014 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $644 $700 Not Implemented
UA0014 # 11 Y:2008 11 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,430 $952 Implemented
UA0013 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,423 $700 Implemented
UA0013 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,905 $0 Not Implemented
UA0013 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,315 $47,838 Implemented
UA0013 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $17,411 $13,088 Implemented
UA0013 # 05 Y:2007 05 2007 USE OPTIMUM THICKNESS INSULATION $3,027 $279 Not Implemented