IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0389 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $120 Not Implemented
KU0389 # 11 Y:1992 11 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $602 $220 Not Implemented
KU0390 # 01 Y:1992 01 1992 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $180,344 $0 Not Implemented
KU0390 # 02 Y:1992 02 1992 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,311 $10,200 Not Implemented
KU0390 # 03 Y:1992 03 1992 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $8,568 $9,570 Not Implemented
KU0390 # 04 Y:1992 04 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $4,504 $0 Implemented
KU0390 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,643 $3,800 Implemented
KU0390 # 06 Y:1992 06 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,635 $5,600 Not Implemented
KU0390 # 07 Y:1992 07 1992 INSTALL SET-BACK TIMERS $3,237 $1,000 Not Implemented
KU0390 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,430 $0 Not Implemented
KU0390 # 09 Y:1992 09 1992 INSTALL SET-BACK TIMERS $1,251 $285 Not Implemented
KU0390 # 10 Y:1992 10 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $891 Not Implemented
KU0390 # 11 Y:1992 11 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,839 $420 Implemented
KU0390 # 12 Y:1992 12 1992 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,696 $1,250 Implemented
KU0390 # 13 Y:1992 13 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,013 $2,973 Not Implemented
KU0390 # 14 Y:1992 14 1992 INSULATE BARE EQUIPMENT $354 $406 Not Implemented
KU0384 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,255 $100 Implemented
KU0384 # 02 Y:1992 02 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,424 $0 Not Implemented
KU0384 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,309 $2,000 Implemented
KU0384 # 04 Y:1992 04 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $730 $2,200 Not Implemented
KU0384 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $1,794 Not Implemented
KU0384 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $0 Implemented
KU0384 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $477 $600 Implemented
KU0384 # 08 Y:1992 08 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $134 $0 Not Implemented
KU0385 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $4,050 Implemented