Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0052 # 06 Y:1986 | 06 | 1986 | IMPROVE LUBRICATION PRACTICES | $3,842 | $0 | Implemented |
CO0052 # 07 Y:1986 | 07 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $111 | $250 | Not Implemented |
CO0052 # 08 Y:1986 | 08 | 1986 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $73 | $30 | Implemented |
CO0052 # 09 Y:1986 | 09 | 1986 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,902 | $4,000 | Implemented |
CO0052 # 10 Y:1986 | 10 | 1986 | INSTALL SET-BACK TIMERS | $1,267 | $657 | Implemented |
KU0182 # 01 Y:1986 | 01 | 1986 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $109,167 | $1,000,000 | Not Implemented |
KU0182 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,883 | $10,000 | Implemented |
KU0182 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,269 | $20 | Not Implemented |
KU0182 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $700 | Implemented |
KU0182 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $3,144 | $3,000 | Implemented |
KU0182 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $882 | $2,000 | Implemented |
KU0182 # 07 Y:1986 | 07 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $801 | $1,400 | Not Implemented |
KU0182 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $160 | $0 | Implemented |
KU0182 # 09 Y:1986 | 09 | 1986 | IMPROVE LUBRICATION PRACTICES | $6,002 | $4,500 | Implemented |
KU0183 # 01 Y:1986 | 01 | 1986 | INSTALL SET-BACK TIMERS | $4,326 | $4,279 | Implemented |
KU0183 # 02 Y:1986 | 02 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,048 | $6,000 | Not Implemented |
KU0183 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,213 | $0 | Implemented |
KU0183 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $2,059 | $1,500 | Implemented |
KU0183 # 05 Y:1986 | 05 | 1986 | OPTIMIZE PLANT POWER FACTOR | $1,423 | $2,500 | Implemented |
KU0183 # 06 Y:1986 | 06 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $626 | $750 | Implemented |
KU0183 # 07 Y:1986 | 07 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $264 | $375 | Not Implemented |
KU0183 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $132 | $0 | Not Implemented |
KU0184 # 01 Y:1986 | 01 | 1986 | IMPROVE LUBRICATION PRACTICES | $327 | $0 | Not Implemented |
KU0184 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $989 | $1,087 | Not Implemented |
KU0184 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,331 | $0 | Not Implemented |