IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,175

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0067 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,141 $481 Implemented
AT0067 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $580 $1,500 Not Implemented
AT0067 # 03 Y:1987 03 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,199 $1,000 Implemented
AT0067 # 04 Y:1987 04 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $174 $50 Implemented
AT0067 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $0 Implemented
AT0068 # 01 Y:1987 01 1987 INSTALL SET-BACK TIMERS $538 $485 Implemented
AT0068 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $231 $303 Implemented
AT0068 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $954 $0 Implemented
AT0068 # 04 Y:1987 04 1987 IMPROVE LUBRICATION PRACTICES $513 $0 Implemented
AT0068 # 05 Y:1987 05 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $83 $150 Implemented
AT0068 # 06 Y:1987 06 1987 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,461 $4,000 Implemented
KU0216 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,533 $20,000 Implemented
KU0216 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,014 $15,000 Not Implemented
KU0216 # 03 Y:1987 03 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,934 $9,000 Not Implemented
KU0216 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $2,429 $683 Implemented
KU0216 # 05 Y:1987 05 1987 IMPROVE LUBRICATION PRACTICES $2,386 $2,250 Implemented
KU0216 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,562 $0 Implemented
KU0216 # 07 Y:1987 07 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,128 $200 Not Implemented
UD0227 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,035 $30,000 Implemented
UD0227 # 02 Y:1987 02 1987 OPTIMIZE PLANT POWER FACTOR $4,712 $12,000 Implemented
UD0227 # 03 Y:1987 03 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,245 $0 Not Implemented
UD0227 # 04 Y:1987 04 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $534 $6,000 Implemented
UD0227 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,752 $0 Not Implemented
UD0228 # 01 Y:1987 01 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,352 $13,000 Implemented
UD0228 # 02 Y:1987 02 1987 REDESIGN PROCESS $734 $200 Not Implemented