IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0343 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $2,239 $4,365 Not Implemented
KU0343 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,754 $5,500 Not Implemented
KU0343 # 06 Y:1991 06 1991 INSTALL TURBULATORS $1,282 $3,157 Not Implemented
KU0343 # 07 Y:1991 07 1991 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,423 $6,200 Not Implemented
KU0343 # 08 Y:1991 08 1991 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,315 $0 Not Implemented
KU0343 # 09 Y:1991 09 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,545 $4,800 Not Implemented
KU0343 # 10 Y:1991 10 1991 ISOLATE HOT OR COLD EQUIPMENT $1,003 $2,180 Not Implemented
KU0343 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $542 $0 Not Implemented
KU0343 # 12 Y:1991 12 1991 INSTALL SET-BACK TIMERS $705 $110 Not Implemented
KU0343 # 13 Y:1991 13 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $447 $560 Not Implemented
KU0343 # 14 Y:1991 14 1991 INSTALL SET-BACK TIMERS $100 $110 Not Implemented
WI0116 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,587 $0 Not Implemented
WI0116 # 02 Y:1991 02 1991 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $8,745 $14,000 Not Implemented
WI0116 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,300 $0 Not Implemented
WI0116 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,577 $0 Not Implemented
WI0116 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,904 $4,000 Not Implemented
WI0116 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,670 $1,200 Not Implemented
WI0116 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,499 $800 Not Implemented
WI0116 # 08 Y:1991 08 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,510 $0 Not Implemented
WI0116 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $0 Not Implemented
WI0116 # 10 Y:1991 10 1991 INSTALL STORM WINDOWS AND DOORS $537 $1,794 Not Implemented
WI0116 # 11 Y:1991 11 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $560 Not Implemented
MA0212 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,099 $2,649 Implemented
MA0212 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $3,090 $3,593 Implemented
MA0212 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,737 $9,055 Implemented