IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0206 # 04 Y:1998 04 1998 AUTOMATE FINISHING PROCESS $128,880 $0 Not Implemented
TN0644 # 01 Y:1998 01 1998 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $363,750 $20,000 Not Implemented
TN0644 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $32,370 $50,000 Implemented
TN0644 # 03 Y:1998 03 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,850 $32,200 Implemented
TN0644 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $11,910 $1,440 Not Implemented
TN0644 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,575 $8,575 Not Implemented
TN0644 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,180 $2,030 Implemented
TN0644 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $2,850 $1,100 Not Implemented
UL0201 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $958 $3,132 Implemented
UL0201 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,962 $1,518 Not Implemented
UL0201 # 03 Y:1998 03 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $2,084 $5,160 Not Implemented
UL0201 # 04 Y:1998 04 1998 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $4,045 $1,125 Not Implemented
UL0201 # 05 Y:1998 05 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $672,266 $138,250 Not Implemented
UL0201 # 06 Y:1998 06 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $342,000 $12,150 Implemented
UL0198 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $45,615 $47,600 Not Implemented
UL0198 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,727 $40 Not Implemented
UL0198 # 03 Y:1998 03 1998 WASH AND REUSE RAGS ON-SITE $99,250 $150,000 Not Implemented
UL0198 # 04 Y:1998 04 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $6,748 $0 Not Implemented
UL0198 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $60,000 $2,000 Not Implemented
UL0205 # 01 Y:1998 01 1998 BURN WOOD BY-PRODUCTS FOR HEAT $89,068 $100,700 Not Implemented
UL0205 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,054 $15,574 Implemented
UL0205 # 03 Y:1998 03 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,019 $0 Implemented
UL0205 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $71,393 $0 Not Implemented
UL0200 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $6,654 Not Implemented
UL0200 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $647 $400 Not Implemented