IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0434 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,856 $29,000 Not Implemented
KU0434 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,795 $10,100 Not Implemented
KU0434 # 05 Y:1994 05 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,951 $1,130 Implemented
KU0434 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $3,050 $825 Not Implemented
KU0434 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $460 $1,466 Not Implemented
KU0434 # 08 Y:1994 08 1994 USE SYNTHETIC LUBRICANT $2,090 $2,363 Not Implemented
KU0434 # 09 Y:1994 09 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $837 $1,486 Not Implemented
KU0434 # 10 Y:1994 10 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,404 $888 Implemented
KU0434 # 11 Y:1994 11 1994 INSTALL OCCUPANCY SENSORS $1,297 $2,487 Not Implemented
KU0434 # 12 Y:1994 12 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $360 Implemented
KU0434 # 13 Y:1994 13 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $452 $582 Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
WV0041 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,160 $584 Implemented
WV0041 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $5,373 $1,250 Not Implemented
WV0041 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $423 $500 Not Implemented
WV0041 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,040 $3,440 Not Implemented
WV0041 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $4,969 $2,202 Not Implemented
WV0041 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $504 $718 Not Implemented