IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0354 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $660 Implemented
ND0354 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,533 $14,644 Implemented
ND0354 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,145 $2,970 Not Implemented
ND0354 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $300 Implemented
ND0354 # 06 Y:2000 06 2000 DEVELOP A REPAIR/REPLACE POLICY $8,446 $27,572 Implemented
ND0354 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $2,685 $6,840 Implemented
ND0354 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,731 $0 Implemented
DS0171 # 01 Y:2000 01 2000 INSTALL SET-BACK TIMERS $1,550 $2,520 n/a
DS0171 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $725 $135 n/a
DS0171 # 03 Y:2000 03 2000 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $8,400 $740 n/a
DS0171 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $81,647 $52,500 n/a
DS0171 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $35,780 $7,500 n/a
DS0171 # 06 Y:2000 06 2000 PAY BILLS ON TIME TO AVOID LATE FEES $143 $0 n/a
IA0252 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,486 $2,487 Not Implemented
IA0252 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,923 $1,921 Implemented
IA0252 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,422 $1,421 Implemented
IA0252 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,856 $2,855 Implemented
IA0252 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,132 $2,132 Implemented
IA0252 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $909 $775 Implemented
IA0252 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $488 $488 Not Implemented
IA0252 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $649 $374 Implemented
IA0252 # 09 Y:2000 09 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $617 $617 Not Implemented
IA0252 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $88,850 $88,849 Not Implemented
IA0252 # 11 Y:2000 11 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $2,101 $2,101 Not Implemented
KU0542 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $900 Not Implemented