IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0674 # 03 Y:2003 03 2003 MODIFY STARTUP/SHUTDOWN TIMES $2,311 $0 Not Implemented
UD0674 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $1,353 $2,168 Not Implemented
UD0674 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $3,078 Not Implemented
UD0674 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $753 $1,048 Not Implemented
UD0674 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $715 $0 Implemented
UD0674 # 08 Y:2003 08 2003 ADD AREA LIGHTING SWITCHES $687 $500 Not Implemented
UD0674 # 09 Y:2003 09 2003 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $623 $604 Not Implemented
UD0674 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $2,200 Implemented
UD0674 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $509 $142 Not Implemented
UD0674 # 12 Y:2003 12 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $481 $0 Implemented
UD0674 # 13 Y:2003 13 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $475 $350 Not Implemented
UD0674 # 14 Y:2003 14 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $100 Implemented
UD0674 # 15 Y:2003 15 2003 DISCONNECT BALLASTS $313 $44 Implemented
LL0172 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $390,733 $195,000 Implemented
LL0172 # 02 Y:2003 02 2003 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $197,664 $250,000 Not Implemented
LL0172 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $101,833 $7,757 Not Implemented
LL0172 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87,485 $28,240 Implemented
LL0172 # 05 Y:2003 05 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $65,820 $312,701 Not Implemented
LL0172 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,972 $5,600 Implemented
LL0172 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $5,380 $682 Not Implemented
LL0172 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $3,809 $1,176 Not Implemented
LL0172 # 09 Y:2003 09 2003 PAY UTILITY BILLS ON TIME $2,767 $30 Implemented
LL0172 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,141 $1,050 Not Implemented
MI0062 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,054 $24 Implemented
MI0062 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,418 $581 Implemented