Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0939 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $269 | $0 | Implemented |
OK0939 # 03 Y:2016 | 03 | 2016 | OPTIMIZE PLANT POWER FACTOR | $1,731 | $5,940 | Not Implemented |
OK0939 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,707 | $0 | Not Implemented |
OK0939 # 05 Y:2016 | 05 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,509 | $100 | Not Implemented |
OK0939 # 06 Y:2016 | 06 | 2016 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,761 | $0 | Implemented |
OK0934 # 01 Y:2016 | 01 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $27,456 | $25,000 | Not Implemented |
OK0934 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,615 | $915 | Not Implemented |
OK0934 # 03 Y:2016 | 03 | 2016 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $134,039 | $1,300 | Implemented |
OK0934 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $63,243 | $3,161 | Implemented |
OK0934 # 05 Y:2016 | 05 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,990 | $0 | Not Implemented |
OK0934 # 06 Y:2016 | 06 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,069 | $10,000 | Not Implemented |
OK0929 # 01 Y:2015 | 01 | 2015 | OPTIMIZE PLANT POWER FACTOR | $26,164 | $68,769 | Not Implemented |
OK0929 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,329 | $20,400 | Not Implemented |
OK0929 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $82,236 | $72,000 | Not Implemented |
OK0927 # 01 Y:2015 | 01 | 2015 | COMBINE UTILITY METERS | $19,646 | $14,000 | Not Implemented |
OK0927 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,107 | $133,275 | Implemented |
OK0926 # 01 Y:2015 | 01 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,746 | $28,000 | Not Implemented |
OK0926 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,480 | $22,750 | Implemented |
OK0926 # 03 Y:2015 | 03 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,134 | $0 | Not Implemented |
OK0926 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,061 | $100,000 | Not Implemented |
OK0921 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,838 | $28,060 | Implemented |
OK0921 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,026 | $832 | Not Implemented |
OK0921 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $13,915 | $4,348 | Implemented |
OK0921 # 04 Y:2015 | 04 | 2015 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $89,313 | $72,000 | Implemented |
OK0921 # 05 Y:2015 | 05 | 2015 | REDUCE FLUID FLOW RATES | $32,332 | $5,000 | Implemented |