IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0939 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $269 $0 Implemented
OK0939 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $1,731 $5,940 Not Implemented
OK0939 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,707 $0 Not Implemented
OK0939 # 05 Y:2016 05 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,509 $100 Not Implemented
OK0939 # 06 Y:2016 06 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,761 $0 Implemented
OK0934 # 01 Y:2016 01 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $27,456 $25,000 Not Implemented
OK0934 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,615 $915 Not Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,990 $0 Not Implemented
OK0934 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,069 $10,000 Not Implemented
OK0929 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $26,164 $68,769 Not Implemented
OK0929 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,329 $20,400 Not Implemented
OK0929 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,236 $72,000 Not Implemented
OK0927 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $19,646 $14,000 Not Implemented
OK0927 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,107 $133,275 Implemented
OK0926 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,746 $28,000 Not Implemented
OK0926 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,480 $22,750 Implemented
OK0926 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,134 $0 Not Implemented
OK0926 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,061 $100,000 Not Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,026 $832 Not Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented