IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,707

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0457 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $691 $752 Implemented
IA0457 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,163 $70 Implemented
IA0457 # 09 Y:2010 09 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,214 $2,400 Implemented
IA0457 # 10 Y:2010 10 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $428 $579 Implemented
IA0457 # 11 Y:2010 11 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,841 $1,000 Not Implemented
IA0457 # 01 Y:2010 01 2010 USE PHOTOCELL CONTROLS $112 $420 Not Implemented
IA0457 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,596 $995 Implemented
IA0457 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,389 $1,210 Implemented
IA0457 # 04 Y:2010 04 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,609 $175 Not Implemented
IA0451 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $1,729 Implemented
IA0451 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,102 $1,000 Implemented
IA0451 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,659 $140 Implemented
IA0451 # 04 Y:2010 04 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,433 $500 Implemented
IA0451 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,483 $2,000 Implemented
IA0451 # 06 Y:2010 06 2010 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,080 $240,000 Not Implemented
IA0447 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $487 Not Implemented
IA0447 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,514 $13,439 Implemented
IA0447 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,599 $1,140 Implemented
IA0447 # 04 Y:2010 04 2010 REDUCE VENTILATION AIR $3,072 $2,000 Implemented
IA0447 # 05 Y:2010 05 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,801 $42,100 Not Implemented
IA0447 # 06 Y:2010 06 2010 REPLACE BOILER $29,283 $53,900 Implemented
IA0447 # 07 Y:2010 07 2010 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $525 $5,000 Implemented
IA0444 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $25 Not Implemented
IA0444 # 02 Y:2009 02 2009 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $2,004 $500 Not Implemented
IA0444 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,271 $27,700 Not Implemented