IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0377 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,352 $1,000 Implemented
IA0377 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,516 $18,000 Not Implemented
IA0377 # 08 Y:2005 08 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,988 $5,000 Implemented
IA0377 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,898 $2,550 Not Implemented
IA0377 # 10 Y:2005 10 2005 INSTALL TIMERS AND/OR THERMOSTATS $2,898 $456 Implemented
IA0377 # 11 Y:2005 11 2005 INSTALL REPLACEMENT DOORS $725 $240 Implemented
IA0377 # 12 Y:2005 12 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,934 $15,000 Not Implemented
WV0330 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $95 Implemented
WV0330 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $474 $140 Not Implemented
WV0330 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $508 $105 Implemented
WV0330 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $789 $6 Implemented
WV0330 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,049 $35 Implemented
WV0330 # 03 Y:2005 03 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $1,364 $3,679 Not Implemented
WV0330 # 02 Y:2005 02 2005 ADD AREA LIGHTING SWITCHES $3,316 $1,325 Implemented
WV0330 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,602 $0 Implemented
MS0288 # 01 Y:2005 01 2005 REPLACE BOILER $67,669 $215,000 Implemented
UM0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,731 $23,005 Not Implemented
UM0292 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,368 $5,000 Implemented
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
UM0292 # 05 Y:2005 05 2005 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,193 $3,000 Not Implemented
UM0292 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $821 $368 Not Implemented
UF0370 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,736 $1,212 Implemented
UF0370 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,004 $1,286 Not Implemented
UF0370 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $20,435 $56,000 Implemented