IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0051 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,235 $248 Implemented
MA0051 # 03 Y:1986 03 1986 REPAIR OR REPLACE STEAM TRAPS $14,400 $650 Implemented
MA0051 # 04 Y:1986 04 1986 COVER OPEN TANKS $12,580 $1,239 Not Implemented
MA0051 # 05 Y:1986 05 1986 INSTALL EFFICIENT RECTIFIERS $8,784 $40,000 Implemented
MA0052 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $41 Not Implemented
MA0052 # 02 Y:1986 02 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $589 $900 Implemented
MA0052 # 03 Y:1986 03 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $375 $0 Implemented
MA0052 # 04 Y:1986 04 1986 BURN WASTE PAPER FOR HEAT $31,590 $40,000 Not Implemented
MA0052 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $449 $1,060 Not Implemented
MA0052 # 06 Y:1986 06 1986 HEAT WATER WITH EXHAUST HEAT $383 $1,500 Implemented
TN0268 # 01 Y:1986 01 1986 USE OPTIMUM THICKNESS INSULATION $2,008 $2,000 Implemented
TN0268 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $0 Implemented
TN0268 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,482 $250 Implemented
TN0268 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $895 $250 Implemented
TN0268 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $529 $200 Not Implemented
TN0268 # 06 Y:1986 06 1986 INSTALL SET-BACK TIMERS $1,600 $0 Not Implemented
TS0032 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,844 $1,500 Not Implemented
TS0032 # 02 Y:1986 02 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,661 $4,000 Not Implemented
TS0032 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $178 Not Implemented
TS0032 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,690 $0 Not Implemented
UD0186 # 01 Y:1986 01 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,459 $0 Implemented
UD0186 # 02 Y:1986 02 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,586 $2,812 Not Implemented
UD0186 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,369 $26,000 Implemented