IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0119 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,270 $10,400 Not Implemented
CO0119 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $2,794 $4,000 Not Implemented
CO0119 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162 $349 Implemented
CO0119 # 07 Y:1988 07 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,867 $3,600 Implemented
CO0119 # 08 Y:1988 08 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,514 $1,000 Not Implemented
CO0119 # 09 Y:1988 09 1988 INSTALL AUTOMATIC STACK DAMPER $677 $900 Not Implemented
CO0119 # 10 Y:1988 10 1988 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $487 $250 Implemented
UD0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $2,800 Implemented
UD0257 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $621 $3,000 Not Implemented
UD0257 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,000 Implemented
UD0257 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,290 $7,000 Not Implemented
UD0257 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $20,153 $80,000 Not Implemented
UD0258 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,392 $0 Not Implemented
UD0258 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $4,256 $9,120 Not Implemented
UD0258 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,481 $12,297 Not Implemented
UD0259 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $182 $0 Implemented
UD0259 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $680 $0 Not Implemented
UD0259 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $64 Implemented
WI0024 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $795 $0 Not Implemented
WI0024 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $541 $1,000 Implemented
WI0024 # 03 Y:1988 03 1988 INSTALL SET-BACK TIMERS $344 $0 Implemented
WI0024 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $667 $950 Not Implemented
WI0024 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $789 $1,200 Not Implemented
WI0024 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $700 Implemented
WI0025 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $1,042 $0 Not Implemented