IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0542 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $600 Not Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
KU0542 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $980 $1,650 Not Implemented
KU0542 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $900 $2,400 Not Implemented
KU0542 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $650 $830 Not Implemented
KU0542 # 08 Y:2000 08 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,680 $2,150 Not Implemented
KU0542 # 09 Y:2000 09 2000 MINIMIZE WATER USAGE $1,560 $2,025 Not Implemented
IA0249 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,706 $127 Not Implemented
IA0249 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,482 $25 Not Implemented
IA0249 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $38 Implemented
IA0249 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,223 $0 Implemented
IA0249 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,737 $5,177 Not Implemented
IA0249 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $2,715 Not Implemented
IA0249 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $609 $665 Not Implemented
IA0249 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $0 Not Implemented
IA0249 # 09 Y:2000 09 2000 CLEAR AND RENT EXISTING SPACE $465,000 $350,000 Not Implemented
IA0249 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $186,600 $90,000 Not Implemented
WV0202 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,260 $900 Not Implemented
WV0202 # 02 Y:2000 02 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,476 $602 Implemented
WV0202 # 03 Y:2000 03 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $10,427 $7,112 Implemented
WV0202 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $375 $200 Not Implemented
WV0202 # 05 Y:2000 05 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $868 $575 Not Implemented
WV0202 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $727 $188 Not Implemented
WV0202 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,659 $1,040 Implemented