Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0181 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $784 | $0 | Implemented |
WM0181 # 06 Y:2022 | 06 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $715 | $0 | Implemented |
WM0181 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $495 | $933 | Not Implemented |
WM0181 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $485 | $705 | Implemented |
WV0624 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $194,747 | $906,700 | Not Implemented |
WV0624 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $59,403 | $137,330 | Not Implemented |
WV0624 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,923 | $170,200 | Not Implemented |
WV0624 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,261 | $53,185 | Not Implemented |
WV0624 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $39,601 | $115,224 | Not Implemented |
WV0624 # 06 Y:2022 | 06 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $33,682 | $7,000 | Implemented |
WV0624 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,225 | $2,763 | Implemented |
WV0624 # 08 Y:2022 | 08 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,511 | $450 | Implemented |
WV0624 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,209 | $15,750 | Not Implemented |
WV0624 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $6,918 | $2,242 | Implemented |
WV0624 # 11 Y:2022 | 11 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,371 | $1,500 | Implemented |
WV0624 # 12 Y:2022 | 12 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $5,615 | $6,090 | Not Implemented |
WV0624 # 13 Y:2022 | 13 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,157 | $6,050 | Implemented |
WV0624 # 14 Y:2022 | 14 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,241 | $6,840 | Implemented |
WV0624 # 15 Y:2022 | 15 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $3,975 | $11,340 | Not Implemented |
WV0624 # 16 Y:2022 | 16 | 2022 | INSULATE BARE EQUIPMENT | $3,078 | $3,446 | Implemented |
WV0624 # 17 Y:2022 | 17 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $368 | $725 | Implemented |
AS0523 # 01 Y:2022 | 01 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $42,697 | $89,337 | Implemented |
AS0523 # 02 Y:2022 | 02 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,604 | $200 | Implemented |
AS0523 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,300 | $7,808 | Implemented |
AS0523 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,242 | $2,695 | Implemented |