Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0375 # 06 Y:1992 | 06 | 1992 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,072 | $350 | Not Implemented |
KU0375 # 07 Y:1992 | 07 | 1992 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $3,055 | $7,752 | Not Implemented |
KU0375 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $587 | $925 | Not Implemented |
KU0375 # 09 Y:1992 | 09 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $449 | $229 | Implemented |
KU0375 # 10 Y:1992 | 10 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $104 | $190 | Not Implemented |
KU0376 # 01 Y:1992 | 01 | 1992 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,889 | $6,000 | Not Implemented |
KU0376 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,930 | $48,000 | Not Implemented |
KU0376 # 03 Y:1992 | 03 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,293 | $0 | Implemented |
KU0376 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,251 | $0 | Implemented |
KU0376 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,366 | $90,000 | Not Implemented |
KU0376 # 06 Y:1992 | 06 | 1992 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,694 | $0 | Not Implemented |
KU0376 # 07 Y:1992 | 07 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,699 | $0 | Implemented |
KU0376 # 08 Y:1992 | 08 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,481 | $0 | Not Implemented |
KU0376 # 09 Y:1992 | 09 | 1992 | INSTALL TURBULATORS | $1,195 | $1,087 | Not Implemented |
KU0376 # 10 Y:1992 | 10 | 1992 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $2,876 | $8,000 | Not Implemented |
KU0376 # 11 Y:1992 | 11 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,686 | $30,000 | Implemented |
KU0376 # 12 Y:1992 | 12 | 1992 | INSULATE BARE EQUIPMENT | $4,572 | $3,450 | Not Implemented |
KU0376 # 13 Y:1992 | 13 | 1992 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $520 | $185 | Not Implemented |
KU0376 # 14 Y:1992 | 14 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,826 | $3,200 | Implemented |
KU0376 # 15 Y:1992 | 15 | 1992 | REPAIR AND ELIMINATE STEAM LEAKS | $1,201 | $120 | Implemented |
KU0376 # 16 Y:1992 | 16 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $721 | $2,550 | Not Implemented |
KU0376 # 17 Y:1992 | 17 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8 | $420 | Not Implemented |
KU0374 # 01 Y:1992 | 01 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,932 | $3,705 | Not Implemented |
KU0374 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $2,477 | $0 | Implemented |
KU0374 # 03 Y:1992 | 03 | 1992 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,925 | $4,800 | Not Implemented |