Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0510 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,610 | $211,134 | Not Implemented |
WV0510 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $47,885 | $8,730 | Not Implemented |
WV0510 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $15,681 | $1,000 | Implemented |
WV0510 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $9,890 | $3,930 | Implemented |
WV0510 # 05 Y:2015 | 05 | 2015 | OPTIMIZE PLANT POWER FACTOR | $9,408 | $24,300 | Not Implemented |
WV0510 # 06 Y:2015 | 06 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $5,855 | $1,108 | Implemented |
WV0510 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,050 | $0 | Implemented |
WV0510 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,904 | $537 | Implemented |
WV0510 # 09 Y:2015 | 09 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,824 | $2,324 | Not Implemented |
WV0510 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,881 | $46 | Implemented |
WV0510 # 11 Y:2015 | 11 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,210 | $7,073 | Not Implemented |
UD0930 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $59,188 | $0 | Implemented |
UD0930 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,352 | $0 | Implemented |
UD0930 # 03 Y:2015 | 03 | 2015 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $2,426 | $300 | Not Implemented |
UD0930 # 04 Y:2015 | 04 | 2015 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $34,411 | $5,100 | Implemented |
UD0930 # 05 Y:2015 | 05 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $43,664 | $10,000 | Not Implemented |
UD0930 # 06 Y:2015 | 06 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,067 | $17,500 | Not Implemented |
UD0930 # 07 Y:2015 | 07 | 2015 | INSTALL COMMON HEADER ON COMPRESSORS | $5,330 | $1,018 | Implemented |
UD0930 # 08 Y:2015 | 08 | 2015 | COVER OPEN TANKS | $5,393 | $300 | Implemented |
UD0930 # 09 Y:2015 | 09 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,032 | $19,284 | Not Implemented |
UD0929 # 01 Y:2015 | 01 | 2015 | BURN A LESS EXPENSIVE GRADE OF FUEL | $424,424 | $0 | Implemented |
UD0929 # 02 Y:2015 | 02 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $90,554 | $10,250 | Not Implemented |
UD0929 # 03 Y:2015 | 03 | 2015 | INSTALL SET-BACK TIMERS | $225,530 | $1,200 | Not Implemented |
UD0929 # 04 Y:2015 | 04 | 2015 | REDUCE EXCESSIVE BOILER BLOWDOWN | $61,951 | $15,000 | Not Implemented |
UD0929 # 05 Y:2015 | 05 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,522 | $12,800 | Implemented |