IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0320 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,381 $700 Implemented
MA0320 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $533 $208 Not Implemented
MA0320 # 05 Y:1994 05 1994 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,164 $23,530 Not Implemented
MA0318 # 07 Y:1994 07 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,520 $383 Not Implemented
MA0318 # 01 Y:1994 01 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,673 $4,305 Not Implemented
MA0318 # 02 Y:1994 02 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,659 $3,520 Not Implemented
MA0318 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,319 $521 Implemented
MA0318 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $2,338 $4,349 Not Implemented
MA0318 # 05 Y:1994 05 1994 USE RADIANT HEATER FOR SPOT HEATING $1,100 $1,410 Not Implemented
MA0318 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,000 $500 Not Implemented
MA0314 # 01 Y:1994 01 1994 REPAIR OR REPLACE STEAM TRAPS $3,446 $2,662 Implemented
MA0314 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,971 $861 Not Implemented
MA0314 # 03 Y:1994 03 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $2,302 $2,233 Not Implemented
MA0314 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $782 $1,284 Not Implemented
MA0314 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $469 $0 Implemented
MA0314 # 06 Y:1994 06 1994 RECOVER AND REUSE COOLING WATER $2,833 $3,454 Implemented
MA0314 # 07 Y:1994 07 1994 USE WATER-BASED ADHESIVES $16,924 $0 Implemented
MA0316 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $21,512 $16,194 Not Implemented
MA0316 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,576 $0 Implemented
MA0316 # 03 Y:1994 03 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,905 $629 Not Implemented
MA0316 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,618 $685 Implemented
MA0316 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $1,426 $1,789 Not Implemented
MA0316 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $1,389 $2,700 Not Implemented
MA0316 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $312 Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented