IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0266 # 04 Y:2008 04 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,996 $23,800 Not Implemented
SU0266 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $339 Implemented
SU0266 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,096 $424 Implemented
SU0266 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $114 $65 Not Implemented
SU0266 # 08 Y:2008 08 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,220 $40,650 Not Implemented
SU0266 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $100 $626 Not Implemented
AM0550 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,000 $84,000 Not Implemented
AM0550 # 02 Y:2008 02 2008 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $50,000 $252,000 Not Implemented
AM0550 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,260 $0 Implemented
AM0550 # 04 Y:2008 04 2008 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,250 $220 Not Implemented
AM0550 # 05 Y:2008 05 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,130 $0 Not Implemented
AM0550 # 06 Y:2008 06 2008 RECOVER AND REUSE COOLING WATER $4,850 $27,325 Not Implemented
AM0550 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,925 $700 Implemented
AM0550 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,800 $640 Implemented
AM0550 # 09 Y:2008 09 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,130 $500 Implemented
AM0550 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $450 $1,260 Not Implemented
BD0343 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $10,631 $12,501 Not Implemented
BD0343 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $6,730 Not Implemented
BD0343 # 03 Y:2008 03 2008 INSTALL SKYLIGHTS $693 $5,713 Not Implemented
BD0343 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $405 Not Implemented
BD0343 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $788 Not Implemented
BD0343 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,874 $9,167 Not Implemented
BD0345 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,896 $6,840 Implemented
BD0345 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $413 $725 Not Implemented
BD0345 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $550 Implemented