Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,377
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0248 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $97,891 | $0 | Implemented |
GT0248 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,990 | $12,500 | Not Implemented |
OK0153 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89 | $75 | Implemented |
OK0153 # 02 Y:1985 | 02 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $580 | $300 | Not Implemented |
OK0153 # 03 Y:1985 | 03 | 1985 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $104 | $259 | Not Implemented |
OK0153 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $282 | $130 | Not Implemented |
OK0153 # 05 Y:1985 | 05 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,170 | $7,500 | Not Implemented |
AT0002 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,115 | $5,740 | Implemented |
AT0002 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $299 | $300 | Not Implemented |
AT0002 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $754 | $2,165 | Implemented |
AT0002 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,923 | $8,325 | Implemented |
AT0001 # 01 Y:1985 | 01 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,819 | $4,000 | Implemented |
AT0001 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,154 | $1,114 | Not Implemented |
AT0001 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,462 | $14,608 | Not Implemented |
AT0001 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $5,546 | $4,829 | Implemented |
AT0001 # 05 Y:1985 | 05 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $114 | $150 | Implemented |
AT0001 # 06 Y:1985 | 06 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,295 | $300 | Implemented |
CO0018 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,938 | $798 | Implemented |
CO0018 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $511 | $300 | Implemented |
CO0018 # 03 Y:1985 | 03 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $17,952 | $100 | Implemented |
CO0018 # 04 Y:1985 | 04 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $54 | $92 | Implemented |
CO0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $304 | $51 | Implemented |
CO0018 # 06 Y:1985 | 06 | 1985 | USE OPTIMUM THICKNESS INSULATION | $550 | $210 | Implemented |
CO0018 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $8,891 | $2,400 | Implemented |
CO0018 # 08 Y:1985 | 08 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $246 | $50 | Implemented |