Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0452 # 06 Y:2018 | 06 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $155,577 | $500,000 | Not Implemented |
LE0452 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,026 | $9,190 | Not Implemented |
LE0452 # 08 Y:2018 | 08 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,475 | $30,000 | Not Implemented |
LE0452 # 09 Y:2018 | 09 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,055 | $5,250 | Not Implemented |
LE0451 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,296 | $40 | Not Implemented |
LE0451 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,551 | $1,000 | Not Implemented |
LE0451 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,386 | $7,000 | Not Implemented |
LE0451 # 04 Y:2018 | 04 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,124 | $4,000 | Not Implemented |
LE0451 # 05 Y:2018 | 05 | 2018 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,686 | $9,000 | Not Implemented |
LE0451 # 06 Y:2018 | 06 | 2018 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $18,094 | $32,500 | Not Implemented |
LE0451 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,710 | $21,525 | Implemented |
LE0451 # 08 Y:2018 | 08 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,589 | $53,000 | Implemented |
MZ0250 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,351 | $5,600 | Implemented |
MZ0250 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,014 | $65,000 | Not Implemented |
MZ0250 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,786 | $280 | Implemented |
MZ0250 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,697 | $0 | Implemented |
LE0450 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,167 | $1,000 | Not Implemented |
LE0450 # 02 Y:2018 | 02 | 2018 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $16,243 | $8,000 | Not Implemented |
LE0450 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,802 | $3,000 | Not Implemented |
LE0450 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,023 | $1,625 | Not Implemented |
LE0450 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,186 | $2,470 | Not Implemented |
LE0450 # 06 Y:2018 | 06 | 2018 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,038 | $8,000 | Not Implemented |
LE0450 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,643 | $36,750 | Not Implemented |
LE0450 # 08 Y:2018 | 08 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,463 | $22,000 | Not Implemented |
MI0327 # 01 Y:2018 | 01 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,286 | $68,000 | Not Implemented |