IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2102 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $322 $453 Not Implemented
CL2102 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $2,846 Implemented
CL2102 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,049 $0 Implemented
UU0179 # 01 Y:2021 01 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,600 $4,000 Not Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
UU0179 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,891 $1,233 Not Implemented
UU0179 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,472 $8,300 Not Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $617 $50 Not Implemented
UU0179 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $345 $747 Not Implemented
WV0604 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,454 $75,747 Not Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented
WV0604 # 08 Y:2021 08 2021 UPGRADE CONTROLS ON COMPRESSORS $1,727 $6,630 Not Implemented
WV0604 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,302 $4,100 Implemented
WV0604 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $35 Implemented
UK2005 # 01 Y:2021 01 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,303 $5,660 n/a
UK2005 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $802 $0 n/a
UK2005 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $5,104 $3,740 n/a
UK2005 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $9,505 $5,250 n/a