IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0115 # 07 Y:1991 07 1991 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,041 $2,700 Implemented
RU0115 # 08 Y:1991 08 1991 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $5,372 $875 Implemented
RU0116 # 01 Y:1991 01 1991 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $8,687 $5,200 Implemented
RU0116 # 02 Y:1991 02 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,716 $0 Implemented
RU0116 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,334 $800 Implemented
CO0212 # 01 Y:1991 01 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,100 $200 Implemented
CO0212 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,300 $2,300 Implemented
CO0212 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $4,840 $4,200 Implemented
CO0212 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,061 $10,000 Implemented
CO0212 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $559 Implemented
CO0212 # 06 Y:1991 06 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $920 $300 Implemented
CO0213 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $52,663 $0 Not Implemented
CO0213 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $6,000 $0 Not Implemented
CO0213 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $900 Not Implemented
CO0213 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,600 $700 Not Implemented
CO0213 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,274 $2,548 Not Implemented
CO0213 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $300 Not Implemented
CO0213 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $1,500 Not Implemented
CO0213 # 08 Y:1991 08 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,100 $14,500 Not Implemented
CO0213 # 09 Y:1991 09 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,300 $18,000 Not Implemented
CO0213 # 10 Y:1991 10 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,600 $4,200 Not Implemented
CO0214 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,100 $5,700 Not Implemented
CO0214 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $280 Not Implemented
CO0214 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $200 Not Implemented
CO0214 # 04 Y:1991 04 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $922 $2,575 Not Implemented