Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,260
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0761 # 12 Y:2007 | 12 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $898 | $1,600 | Implemented |
UD0761 # 13 Y:2007 | 13 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $357 | $0 | Implemented |
OK0745 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,891 | $360 | Implemented |
OK0745 # 02 Y:2007 | 02 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $57,727 | $3,600 | Not Implemented |
OK0745 # 03 Y:2007 | 03 | 2007 | INSULATE BARE EQUIPMENT | $13,884 | $4,859 | Implemented |
OK0745 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $2,384 | $744 | Not Implemented |
OK0745 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,437 | $1,574 | Not Implemented |
OK0745 # 06 Y:2007 | 06 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,998 | $9,010 | Not Implemented |
OK0745 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,171 | $81,808 | Not Implemented |
OK0745 # 08 Y:2007 | 08 | 2007 | OPTIMIZE PLANT POWER FACTOR | $1,509 | $6,760 | Not Implemented |
OK0745 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,516 | $7,600 | Not Implemented |
OK0745 # 10 Y:2007 | 10 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $609 | $3,125 | Not Implemented |
OK0745 # 11 Y:2007 | 11 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $37,616 | $286,361 | Implemented |
SF0342 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $250,944 | $80,000 | Not Implemented |
SF0342 # 02 Y:2007 | 02 | 2007 | AVOID FROST FORMATION ON EVAPORATORS | $86,147 | $41,628 | Not Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,598 | $1,412 | Not Implemented |
SF0342 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,282 | $34,413 | Not Implemented |
SF0342 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $17,040 | $25,438 | Not Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 08 Y:2007 | 08 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $130,413 | $250,000 | Not Implemented |
SF0342 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,865 | $13,500 | Not Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |
SF0342 # 11 Y:2007 | 11 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,536 | $5,000 | Not Implemented |
IC0126 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,723 | $55,780 | Implemented |