Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0168 # 02 Y:1999 | 02 | 1999 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $38,680 | $200,000 | Not Implemented |
NC0168 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $34,792 | $5,000 | Not Implemented |
NC0168 # 04 Y:1999 | 04 | 1999 | BURN WASTE OIL FOR HEAT | $787 | $2,000 | Not Implemented |
NC0168 # 05 Y:1999 | 05 | 1999 | METER WASTE WATER | $16,740 | $3,500 | Not Implemented |
ME0271 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,060 | $47,675 | Implemented |
ME0271 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,694 | $11,058 | Implemented |
ME0271 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,248 | $150 | Implemented |
ME0271 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $731 | $1,580 | Not Implemented |
ME0271 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $366 | $407 | Implemented |
ME0271 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $224 | $100 | Implemented |
ME0271 # 07 Y:1999 | 07 | 1999 | MINIMIZE WATER USAGE | $8,700 | $6,800 | Not Implemented |
ME0271 # 08 Y:1999 | 08 | 1999 | USE OTHER METHODS FOR NEUTRALIZATION | $6,000 | $7,800 | Not Implemented |
ME0271 # 09 Y:1999 | 09 | 1999 | METER WASTE WATER | $1,684 | $200 | Implemented |
SD0235 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,382 | $7,776 | Not Implemented |
SD0235 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,361 | $1,782 | Not Implemented |
SD0235 # 03 Y:1999 | 03 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,356 | $0 | Not Implemented |
SD0235 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,218 | $23,830 | Implemented |
SD0235 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,852 | $0 | Not Implemented |
SD0235 # 06 Y:1999 | 06 | 1999 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,794 | $14,000 | Not Implemented |
SD0235 # 07 Y:1999 | 07 | 1999 | $7,690 | $0 | Not Implemented | |
SD0235 # 08 Y:1999 | 08 | 1999 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $594 | $0 | Not Implemented |
SD0235 # 09 Y:1999 | 09 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $34,580 | $20,000 | Not Implemented |
SD0235 # 10 Y:1999 | 10 | 1999 | $107,143 | $115,000 | Not Implemented | |
SD0235 # 11 Y:1999 | 11 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,793 | $0 | Implemented |
SD0235 # 12 Y:1999 | 12 | 1999 | $4,290 | $8,840 | Not Implemented |