IAC logo
IAC Assessment: SD0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product paint and coatings
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 91,250
Annual Production 485 Thousand Gallons
Production Hrs. Annual 2,677
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,730 1,049,824 kWh $0.08
Electricity Demand $41,676 5,251 kW-months/year $7.94
Natural Gas $493 69 MMBtu $7.14
TOTAL ENERGY COSTS $126,408
RECOMMENDED SAVINGS* $220,375 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,333
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,382
Cost:
$7,776
$2,436 31,653 $946 120 - - - - - - $2,436
31,653
kWh
$946
120
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,361
Cost:
$1,782
$980 12,896 $381 48 - - - - - - $980
12,896
kWh
$381
48
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,356
Cost:
-
$2,294 29,894 $1,062 134 - - - - - - $2,294
29,894
kWh
$1,062
134
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,218
Cost:
$23,830
$5,530 74,443 $12,688 5,530 - - - - - - $5,530
74,443
kWh
$12,688
5,530
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,852
Cost:
-
$5,852 76,202 - - - - - - - - $5,852
76,202
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$3,794
Cost:
$14,000
$2,595 33,705 $1,199 151 - - - - - - $2,595
33,705
kWh
$1,199
151
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$7,690
Cost:
-
- - - - - - - - $7,690 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$7,690
-
$
08: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$594
Cost:
-
- - - - - - $594 3,168 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$594
3,168
lb
-
-
$
09: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$34,580
Cost:
$20,000
- - - - $34,580 11,520 - - - - -
-
kWh
-
-
kW-months/year
$34,580
11,520
gal
-
-
lb
-
-
$
10: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$107,143
Cost:
$115,000
- - - - - - - - $107,143 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$107,143
-
$
11: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,793
Cost:
-
- - $21,793 317 - - - - - - -
-
kWh
$21,793
317
kW-months/year
-
-
gal
-
-
lb
-
-
$
12: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$4,290
Cost:
$8,840
- - - - - - - - $4,290 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$4,290
-
$
13: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$3,960
Cost:
-
- - - - - - - - $3,960 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$3,960
-
$
14: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,362
Cost:
$1,078
- - $4,362 201 - - - - - - -
-
kWh
$4,362
201
kW-months/year
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$220,375
Cost:
$192,306
$19,687 258,793 $42,431 6,501 $34,580 11,520 $594 3,168 $123,083 - $19,687
258,793
kWh
$42,431
6,501
kW-months/year
$34,580
11,520
gal
$594
3,168
lb
$123,083
-
$
TOTAL IMPLEMENTED Savings:
$48,333
Cost:
$24,908
$5,530 74,443 $38,843 6,048 - - - - $3,960 - $5,530
74,443
kWh
$38,843
6,048
kW-months/year
-
-
gal
-
-
lb
$3,960
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (haz) Administrative Changes