Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0002 # 04 Y:1991 | 04 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,464 | $0 | Implemented |
UF0002 # 05 Y:1991 | 05 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $251 | $2,520 | Implemented |
UF0002 # 06 Y:1991 | 06 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $6,167 | $5,300 | Implemented |
UF0002 # 07 Y:1991 | 07 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,029 | $0 | Implemented |
WI0114 # 01 Y:1991 | 01 | 1991 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $18,289 | $500 | Not Implemented |
WI0114 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,641 | $2,520 | Not Implemented |
WI0114 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,486 | $500 | Not Implemented |
WI0114 # 04 Y:1991 | 04 | 1991 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $229 | $52 | Not Implemented |
WI0114 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $205 | $0 | Not Implemented |
WI0114 # 06 Y:1991 | 06 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $161 | $0 | Not Implemented |
WI0114 # 07 Y:1991 | 07 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $127 | $0 | Not Implemented |
WI0114 # 08 Y:1991 | 08 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $72 | $200 | Not Implemented |
WI0114 # 09 Y:1991 | 09 | 1991 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,644 | $6,000 | Not Implemented |
WI0115 # 01 Y:1991 | 01 | 1991 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,437 | $0 | Implemented |
WI0115 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,500 | $10,000 | Implemented |
WI0115 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $261 | $188 | Implemented |
WI0115 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $587 | $240 | Implemented |
WI0115 # 05 Y:1991 | 05 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $313 | $2,100 | Implemented |
WI0115 # 06 Y:1991 | 06 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $370 | $1,400 | Implemented |
WI0115 # 07 Y:1991 | 07 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $200 | $0 | Implemented |
WI0115 # 08 Y:1991 | 08 | 1991 | INSTALL SET-BACK TIMERS | $186 | $200 | Implemented |
WI0115 # 09 Y:1991 | 09 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $160 | $200 | Implemented |
WI0115 # 10 Y:1991 | 10 | 1991 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $134 | $0 | Implemented |
TN0426 # 01 Y:1991 | 01 | 1991 | USE MINIMUM STEAM OPERATING PRESSURE | $10,911 | $500 | Implemented |
TN0426 # 02 Y:1991 | 02 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,789 | $1,000 | Implemented |