IAC logo
IAC Assessment: TN0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1991
Principal Product HAMS, SHOULDERS, SAUSAGE
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pounds
Production Hrs. Annual 5,304
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,140 4,667,058 kWh $0.04
Natural Gas $84,624 18,392 MMBtu $4.60
TOTAL ENERGY COSTS $282,764
RECOMMENDED SAVINGS* $15,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,887
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$10,911
Cost:
$500
- - $10,911 2,372 -
-
kWh
$10,911
2,372
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,789
Cost:
$1,000
- - $1,789 389 -
-
kWh
$1,789
389
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$897
Cost:
$25
- - $897 195 -
-
kWh
$897
195
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$327
Cost:
$45
- - $327 71 -
-
kWh
$327
71
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$455
Cost:
$400
$455 10,844 - - $455
10,844
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$360
Cost:
$940
$360 8,499 - - $360
8,499
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$345
Cost:
$556
$345 8,206 - - $345
8,206
kWh
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$803
Cost:
$1,375
$803 - - - $803
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,887
Cost:
$4,841
$1,963 27,549 $13,924 3,027 $1,963
27,549
kWh
$13,924
3,027
MMBtu
TOTAL IMPLEMENTED Savings:
$15,887
Cost:
$4,841
$1,963 27,549 $13,924 3,027 $1,963
27,549
kWh
$13,924
3,027
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas