IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,521

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2317 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,385 $90 n/a
KS2317 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $5,480 n/a
KS2317 # 03 Y:2023 03 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $563 $411 n/a
KS2317 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,851 $1,638 n/a
KS2317 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,312 $31,554 n/a
KS2317 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $251 $296 n/a
KS2317 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,384 $459,169 n/a
KS2316 # 01 Y:2023 01 2023 REPAIR AND ELIMINATE STEAM LEAKS $11,534 $2,766 Implemented
KS2316 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,197 $1,784 Not Implemented
KS2316 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,228 $2,463 Not Implemented
KS2316 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,417 $0 Not Implemented
KS2316 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,127 $627,000 Not Implemented
KS2316 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,198 $29,442 Not Implemented
KS2316 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $7,751 $6,350 Not Implemented
KS2316 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,336 $29,920 Implemented
KS2316 # 09 Y:2023 09 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,691 $246,356 Implemented
KS2316 # 10 Y:2023 10 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,892 $156,412 Implemented
KS2316 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $52,146 $422,182 Not Implemented
GT0966 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,835 $800 Implemented
GT0966 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $63,527 $1,850 Implemented
GT0966 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $73,258 $6,000 Not Implemented
GT0966 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,404 $400 Not Implemented
GT0966 # 05 Y:2023 05 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $721 $630 Not Implemented
GT0966 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,382 $9,263 Implemented
GT0966 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $2,955 $13,403 Not Implemented