IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0352 # 10 Y:2019 10 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $603 $2,315 Implemented
MI0352 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $160 Not Implemented
MI0352 # 12 Y:2019 12 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $518 $2,294 Implemented
MI0351 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $87,352 $12,000 Implemented
MI0351 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,064 $2,020 Implemented
MI0351 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,747 $480 Implemented
MI0351 # 04 Y:2019 04 2019 USE SOLAR HEAT TO HEAT WATER $34,199 $21,195 Not Implemented
MI0351 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,493 $11,078 Implemented
MI0351 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $14,383 $25,700 Not Implemented
MI0351 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $14,048 $820 Implemented
MI0351 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $6,022 $600 Implemented
MI0351 # 09 Y:2019 09 2019 ISOLATE HOT OR COLD EQUIPMENT $508 $600 Implemented
MI0345 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $7,969 $3,100 Implemented
MI0345 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,837 $3,204 Implemented
MI0345 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $3,443 Implemented
MI0345 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,410 $1,982 Not Implemented
MI0345 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,380 $540 Implemented
MI0345 # 06 Y:2018 06 2018 USE SOLAR HEAT TO HEAT WATER $1,166 $2,755 Implemented
MI0345 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $810 $2,138 Not Implemented
MI0345 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $785 $1,560 Not Implemented
MI0344 # 01 Y:2018 01 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $55,478 $62,800 Not Implemented
MI0344 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $12,638 $18,415 Not Implemented
MI0344 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,405 $6,666 Implemented
MI0344 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,313 $15,147 Implemented
MI0344 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $7,317 $9,570 Not Implemented