Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,150
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0101 # 02 Y:1983 | 02 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,217 | $0 | Implemented |
UD0101 # 03 Y:1983 | 03 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $548 | $0 | Not Implemented |
UD0101 # 04 Y:1983 | 04 | 1983 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,185 | $60,000 | Not Implemented |
UD0102 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,360 | $20,448 | Not Implemented |
UD0103 # 01 Y:1983 | 01 | 1983 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $7,752 | $10,000 | Not Implemented |
UD0103 # 02 Y:1983 | 02 | 1983 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,536 | $20,000 | Not Implemented |
UD0104 # 01 Y:1983 | 01 | 1983 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $39,300 | $0 | Implemented |
UD0104 # 02 Y:1983 | 02 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,527 | $0 | Implemented |
UD0104 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $10,180 | $4,000 | Implemented |
UD0104 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,605 | $1,592 | Implemented |
UD0104 # 05 Y:1983 | 05 | 1983 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,680 | $3,100 | Implemented |
UD0104 # 06 Y:1983 | 06 | 1983 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $2,683 | $8,480 | Implemented |
UD0105 # 01 Y:1983 | 01 | 1983 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $18,641 | $60,000 | Not Implemented |
UD0105 # 02 Y:1983 | 02 | 1983 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,481 | $1,800 | Not Implemented |
UD0105 # 03 Y:1983 | 03 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,286 | $3,840 | Implemented |
UD0105 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,661 | $167 | Implemented |
UD0106 # 01 Y:1983 | 01 | 1983 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,583 | $4,300 | Implemented |
UD0106 # 02 Y:1983 | 02 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,290 | $18,216 | Not Implemented |
UD0106 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,363 | $2,153 | Implemented |
GT0193 # 01 Y:1983 | 01 | 1983 | MODIFY TEXTILE DRYERS | $159,000 | $60,000 | Not Implemented |
GT0193 # 02 Y:1983 | 02 | 1983 | CONTROL PRESSURE ON STEAMER OPERATIONS | $13,000 | $4,500 | Not Implemented |
GT0193 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,300 | $5,000 | Not Implemented |
GT0193 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,700 | $500 | Not Implemented |
GT0193 # 05 Y:1983 | 05 | 1983 | REPAIR AND ELIMINATE STEAM LEAKS | $10,600 | $900 | Not Implemented |
GT0193 # 06 Y:1983 | 06 | 1983 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $13,000 | $3,100 | Not Implemented |