Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0443 # 02 Y:2003 | 02 | 2003 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $46,744 | $15,000 | Not Implemented |
OR0443 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,000 | $0 | Not Implemented |
OR0443 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,080 | $10,100 | Implemented |
OR0443 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,950 | $16,800 | n/a |
OR0443 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,770 | $665 | Implemented |
OR0443 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,348 | $0 | Not Implemented |
SF0273 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,765 | $300 | Implemented |
SF0273 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,656 | $480 | Implemented |
SF0273 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,380 | $8,846 | Not Implemented |
SF0273 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,094 | $76,555 | Not Implemented |
SF0273 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,201 | $7,700 | Not Implemented |
SF0273 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $728 | Implemented |
SF0273 # 07 Y:2003 | 07 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $946 | $1,286 | Not Implemented |
SF0273 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $36,828 | $60,000 | Not Implemented |
SF0273 # 09 Y:2003 | 09 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,493 | $15,750 | Not Implemented |
SF0273 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,103 | $13,336 | Implemented |
SF0273 # 11 Y:2003 | 11 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,386 | $1,395 | Not Implemented |
SF0273 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,355 | $84,428 | Implemented |
SF0273 # 13 Y:2003 | 13 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,475 | $72,000 | Not Implemented |
SF0273 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $3,232 | $17,400 | Implemented |
SF0273 # 15 Y:2003 | 15 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $810 | $0 | Not Implemented |
SF0273 # 16 Y:2003 | 16 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $7,467 | $6,400 | Not Implemented |
SF0273 # 17 Y:2003 | 17 | 2003 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $6,279 | $6,714 | Not Implemented |
MA0542 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $14,636 | $22,869 | Not Implemented |
MA0542 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,600 | $21,400 | Not Implemented |