IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0370 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,994 $731 Not Implemented
UF0370 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $43,146 $1,190 Not Implemented
UF0370 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,525 $0 Not Implemented
UF0370 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $4,053 $1,317 Implemented
UF0370 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $926 $959 Not Implemented
UF0370 # 09 Y:2005 09 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,299 $130,000 Implemented
UF0370 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $760 Not Implemented
UF0370 # 11 Y:2005 11 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,313 $0 Implemented
UF0370 # 12 Y:2005 12 2005 IMPROVE SPACE COMFORT CONDITIONING $3,223 $12,400 Not Implemented
TA0109 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,692 $1,000 Not Implemented
TA0109 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,200 $25,500 Not Implemented
TA0109 # 03 Y:2005 03 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,870 $-7,870 Not Implemented
TA0109 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,691 $5,500 Not Implemented
TA0109 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $502 $616 Not Implemented
TA0109 # 06 Y:2005 06 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $356 $0 Not Implemented
AS0411 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,988 $21,600 Not Implemented
AS0411 # 02 Y:2005 02 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,100 $1,500 Not Implemented
AS0411 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,306 $1,000 Implemented
AS0411 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $6,515 $10,000 Not Implemented
AS0411 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,783 $11,000 Not Implemented
AS0411 # 06 Y:2005 06 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,077 $8,000 Implemented
AS0411 # 07 Y:2005 07 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,150 $991 Not Implemented
AS0410 # 01 Y:2005 01 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,503 $6,000 Not Implemented
AS0410 # 02 Y:2005 02 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,150 $6,600 Not Implemented
AS0410 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,623 $100 Implemented