IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0537 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $400 $11 Implemented
AS0537 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $151 $394 Implemented
AS0537 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $475 $250 Implemented
UA0267 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $13,660 $51,749 Not Implemented
UA0267 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,033 $1,000 Implemented
UA0267 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,954 $1,360 Implemented
UA0267 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $2,388 $1,682 Not Implemented
UA0267 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $677 $901 Implemented
AS0536 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $43,996 $407,250 Not Implemented
AS0536 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,017 $3,981 Not Implemented
AS0536 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,644 $1,415 Not Implemented
AS0536 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,609 $579 Not Implemented
AS0536 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $294 $77 Not Implemented
CI0005 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $38,200 $16,400 Not Implemented
CI0005 # 02 Y:2022 02 2022 REPLACE BOILER $15,803 $9,000 Not Implemented
CI0005 # 03 Y:2022 03 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,639 $30,000 Not Implemented
CI0005 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,840 $300 Not Implemented
CI0005 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $3,625 $13,372 Not Implemented
CI0005 # 06 Y:2022 06 2022 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $2,348 $8,100 Not Implemented
CI0005 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,483 $99 Implemented
CI0005 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,446 $0 Not Implemented
CI0005 # 09 Y:2022 09 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $563 $500 Implemented
CI0005 # 10 Y:2022 10 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $323 $0 Not Implemented
UA0266 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,219 $1,000 Not Implemented
UA0266 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $17,514 $8,397 Not Implemented