Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0312 # 04 Y:1990 | 04 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,778 | $4,500 | Implemented |
KU0312 # 05 Y:1990 | 05 | 1990 | INSTALL AUTOMATIC STACK DAMPER | $1,354 | $1,700 | Not Implemented |
KU0306 # 01 Y:1990 | 01 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,917 | $1,500 | Not Implemented |
KU0306 # 02 Y:1990 | 02 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,435 | $200 | Not Implemented |
KU0306 # 03 Y:1990 | 03 | 1990 | OPTIMIZE PLANT POWER FACTOR | $20,507 | $33,600 | Not Implemented |
KU0306 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,107 | $1,966 | Not Implemented |
KU0306 # 05 Y:1990 | 05 | 1990 | IMPROVE LUBRICATION PRACTICES | $8,748 | $0 | Implemented |
KU0306 # 06 Y:1990 | 06 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,643 | $4,359 | Implemented |
KU0306 # 07 Y:1990 | 07 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,326 | $0 | Not Implemented |
KU0306 # 08 Y:1990 | 08 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $229 | $0 | Not Implemented |
KU0303 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $405 | $652 | Implemented |
KU0303 # 02 Y:1990 | 02 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,266 | $600 | Not Implemented |
KU0303 # 03 Y:1990 | 03 | 1990 | INSTALL AUTOMATIC STACK DAMPER | $789 | $700 | Implemented |
KU0303 # 04 Y:1990 | 04 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $374 | $750 | Implemented |
KU0303 # 05 Y:1990 | 05 | 1990 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $533 | $300 | Implemented |
KU0303 # 06 Y:1990 | 06 | 1990 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,397 | $400 | Implemented |
KU0304 # 01 Y:1990 | 01 | 1990 | INSTALL SET-BACK TIMERS | $1,985 | $400 | Not Implemented |
KU0304 # 02 Y:1990 | 02 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,590 | $15,212 | Implemented |
KU0304 # 03 Y:1990 | 03 | 1990 | OPTIMIZE PLANT POWER FACTOR | $66,605 | $54,000 | Implemented |
KU0304 # 04 Y:1990 | 04 | 1990 | SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY | $1,365 | $200 | Implemented |
KU0304 # 05 Y:1990 | 05 | 1990 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $35,795 | $40,000 | Not Implemented |
KU0304 # 06 Y:1990 | 06 | 1990 | INSTALL AUTOMATIC STACK DAMPER | $1,690 | $3,000 | Implemented |
KU0304 # 07 Y:1990 | 07 | 1990 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $18,888 | $13,080 | Not Implemented |
KU0304 # 08 Y:1990 | 08 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $76,000 | $50,000 | Implemented |
KU0305 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $76,107 | $149,700 | Implemented |