IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0419 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $2,671 $3,405 Not Implemented
UF0419 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $32,995 $9,325 Not Implemented
UF0419 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $112,051 $1,026 Not Implemented
UF0419 # 08 Y:2009 08 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $107,292 $42,500 Not Implemented
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
GT0862 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,845 $17,464 Not Implemented
GT0862 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $962 $0 Not Implemented
GT0862 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $439 $0 Not Implemented
GT0862 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $810 $500 Not Implemented
GT0862 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $325 $449 Not Implemented
GT0862 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,517 $9,840 Not Implemented
GT0862 # 07 Y:2009 07 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,618 $11,925 Not Implemented
GT0861 # 01 Y:2009 01 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,115 $0 Not Implemented
GT0861 # 02 Y:2009 02 2009 USE MINIMUM SAFE OVEN VENTILATION $246,400 $5,600 Not Implemented
GT0861 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $38,729 $40,000 Implemented
GT0861 # 04 Y:2009 04 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,626 $0 Not Implemented
GT0861 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $98,000 $244,260 Implemented
GT0861 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $6,025 $951 Implemented
GT0861 # 07 Y:2009 07 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,257 $2,400 Not Implemented
GT0861 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,345 $17,129 Not Implemented
GT0861 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,933 $60,324 Not Implemented
GT0861 # 10 Y:2009 10 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $83,157 $231,450 Not Implemented
LL0307 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $8,550 $1,841 Implemented
LL0307 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,776 $6,070 Not Implemented