IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,910

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0197 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $33,478 $697 Implemented
IP0197 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,662 $320 Not Implemented
IP0197 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,000 $1,506 Implemented
IP0197 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,370 $13,000 Implemented
IP0197 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,867 $18,107 Implemented
MU0050 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,159 $262 Not Implemented
MU0050 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,726 $23,976 Not Implemented
MU0050 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $732 $435 Not Implemented
MU0050 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $20 $47 Not Implemented
MU0050 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $320 Not Implemented
MU0050 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,560 $2,073 Not Implemented
MU0050 # 07 Y:2024 07 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,230 $0 Not Implemented
MU0050 # 08 Y:2024 08 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,301 $10,644 Not Implemented
MU0050 # 09 Y:2024 09 2024 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $540 $2,466 Not Implemented
MI0445 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $427,475 $602,500 n/a
MI0445 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217,248 $42,472 n/a
MI0445 # 03 Y:2024 03 2024 PAY UTILITY BILLS ON TIME $80,165 $0 n/a
MI0445 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $46,588 $99,444 n/a
MI0445 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,574 $11,027 n/a
MI0445 # 06 Y:2024 06 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,584 $150 n/a
MI0445 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,583 $5,793 n/a
MI0445 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $3,269 $2,860 n/a
AS0582 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $27,124 $186,339 Implemented
AS0582 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,181 $26,757 Implemented
AS0582 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,400 $204,000 Implemented