IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0240 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,950 $7,729 Implemented
OR0240 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,925 $57,725 Not Implemented
OR0240 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $410 $0 Not Implemented
OR0240 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,795 $99,195 Implemented
OR0240 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,308 $15,000 Implemented
OR0240 # 06 Y:1995 06 1995 UPGRADE CONTROLS ON COMPRESSORS $2,403 $500 Not Implemented
OR0240 # 07 Y:1995 07 1995 OPTIMIZE PLANT POWER FACTOR $16,062 $20,000 Not Implemented
MS0033 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $16,206 $7,500 Implemented
MS0033 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,336 $2,170 Implemented
MS0033 # 03 Y:1995 03 1995 INSTALL TIMERS AND/OR THERMOSTATS $393 $730 Not Implemented
MS0033 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,552 $5,640 Not Implemented
MS0033 # 05 Y:1995 05 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $152,895 $101,700 Not Implemented
NV0035 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,168 $7,072 Implemented
NV0035 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,143 $300 Implemented
NV0035 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,817 $1,400 Not Implemented
NV0035 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $761 $511 Not Implemented
NV0035 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $1,667 $4,058 Not Implemented
MO0155 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,442 $16,728 Implemented
MO0155 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,685 $6,822 Implemented
MO0155 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $253 $0 Implemented
MO0155 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,314 $5,555 Implemented
MO0155 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $92 $40 Implemented
MO0155 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $624 $590 Implemented
MO0155 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,057 $500 Implemented
MO0155 # 08 Y:1995 08 1995 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $96 $10 Implemented