IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0237 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $2,398 $200 Implemented
MA0237 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,234 $400 Implemented
MA0231 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $95,745 $229,893 Not Implemented
MA0231 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,364 $30,000 Not Implemented
MA0231 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $5,409 $2,790 Not Implemented
MA0231 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $3,499 $11,534 Not Implemented
MA0231 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36 Implemented
MA0231 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,652 $20,657 Not Implemented
MA0231 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $0 Implemented
MA0231 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,209 $11,204 Not Implemented
MA0231 # 09 Y:1992 09 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $318 $740 Not Implemented
MA0226 # 01 Y:1991 01 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,242 $21,238 Implemented
MA0226 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $6,376 $0 Implemented
MA0226 # 03 Y:1991 03 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,696 $0 Implemented
MA0226 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,079 $9,000 Implemented
MA0226 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $3,303 $856 Implemented
MA0226 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $3,020 Implemented
MA0223 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,884 $1,100 Implemented
MA0223 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $2,810 $220 Implemented
MA0223 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $399 $11,600 Implemented
MA0223 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $532 $265 Not Implemented
MA0223 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,144 $600 Not Implemented
MA0223 # 06 Y:1991 06 1991 AIR CONDITION ONLY SPACE NECESSARY $968 $100 Implemented
MA0223 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $721 $1,495 Not Implemented
MA0223 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented