IAC logo
IAC Assessment: MA0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1992
Principal Product BLEACHED COTTON
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 32,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $651,729 8,207,796 kWh $0.08
Fuel Oil #6 $478,069 188,009 MMBtu $2.54
TOTAL ENERGY COSTS $1,129,798
RECOMMENDED SAVINGS* $40,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,530
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6
$ kWh $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$19,462
Cost:
$200
$(-5,538) (-69,754) $25,000 9,842 $(-5,538)
(-69,754)
kWh
$25,000
9,842
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$6,172
Cost:
$1,000
- - $6,172 2,430 -
-
kWh
$6,172
2,430
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,049
Cost:
$2
$4,049 50,996 - - $4,049
50,996
kWh
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,462
Cost:
$2,000
- - $3,462 1,363 -
-
kWh
$3,462
1,363
MMBtu
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,753
Cost:
-
$2,753 - - - $2,753
-
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,398
Cost:
$200
- - $2,398 944 -
-
kWh
$2,398
944
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,234
Cost:
$400
$2,234 28,136 - - $2,234
28,136
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,530
Cost:
$3,802
$3,498 9,378 $37,032 14,579 $3,498
9,378
kWh
$37,032
14,579
MMBtu
TOTAL IMPLEMENTED Savings:
$40,530
Cost:
$3,802
$3,498 9,378 $37,032 14,579 $3,498
9,378
kWh
$37,032
14,579
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6