IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0291 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $295 $650 Not Implemented
KU0285 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,382 $1,500 Implemented
KU0285 # 02 Y:1989 02 1989 REDESIGN PROCESS $6,788 $7,000 Not Implemented
KU0285 # 03 Y:1989 03 1989 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,165 $2,000 Not Implemented
KU0285 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,527 $24,000 Implemented
KU0285 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,478 $22,600 Implemented
KU0285 # 06 Y:1989 06 1989 INSTALL AUTOMATIC STACK DAMPER $3,601 $7,600 Implemented
KU0285 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $906 $2,500 Implemented
KU0285 # 08 Y:1989 08 1989 RECOVER AND REUSE COOLING WATER $16,548 $2,500 Implemented
KU0285 # 09 Y:1989 09 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,347 $26,640 Not Implemented
KU0285 # 10 Y:1989 10 1989 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $26,087 $60,000 Not Implemented
KU0285 # 11 Y:1989 11 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,539 $50,000 Implemented
OK0290 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $1,080 Implemented
OK0290 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,374 $1,890 Not Implemented
OK0290 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $334 Implemented
OK0290 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $575 $2,279 Not Implemented
OK0291 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $668 Implemented
OK0291 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,376 $18,000 Not Implemented
OK0291 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $973 $909 Implemented
OK0291 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $4,974 $0 Implemented
OK0291 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $356 $480 Not Implemented
OK0291 # 06 Y:1989 06 1989 INSTALL TURBULATORS $1,310 $2,450 Not Implemented
OK0291 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $844 $1,500 Implemented
OK0291 # 08 Y:1989 08 1989 COVER OPEN TANKS $360 $955 Not Implemented
OK0291 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,262 $100 Implemented