Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0291 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $295 | $650 | Not Implemented |
KU0285 # 01 Y:1989 | 01 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,382 | $1,500 | Implemented |
KU0285 # 02 Y:1989 | 02 | 1989 | REDESIGN PROCESS | $6,788 | $7,000 | Not Implemented |
KU0285 # 03 Y:1989 | 03 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,165 | $2,000 | Not Implemented |
KU0285 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,527 | $24,000 | Implemented |
KU0285 # 05 Y:1989 | 05 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,478 | $22,600 | Implemented |
KU0285 # 06 Y:1989 | 06 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $3,601 | $7,600 | Implemented |
KU0285 # 07 Y:1989 | 07 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $906 | $2,500 | Implemented |
KU0285 # 08 Y:1989 | 08 | 1989 | RECOVER AND REUSE COOLING WATER | $16,548 | $2,500 | Implemented |
KU0285 # 09 Y:1989 | 09 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,347 | $26,640 | Not Implemented |
KU0285 # 10 Y:1989 | 10 | 1989 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $26,087 | $60,000 | Not Implemented |
KU0285 # 11 Y:1989 | 11 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $39,539 | $50,000 | Implemented |
OK0290 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $1,539 | $1,080 | Implemented |
OK0290 # 02 Y:1989 | 02 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,374 | $1,890 | Not Implemented |
OK0290 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,517 | $334 | Implemented |
OK0290 # 04 Y:1989 | 04 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $575 | $2,279 | Not Implemented |
OK0291 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,092 | $668 | Implemented |
OK0291 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,376 | $18,000 | Not Implemented |
OK0291 # 03 Y:1989 | 03 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $973 | $909 | Implemented |
OK0291 # 04 Y:1989 | 04 | 1989 | IMPROVE LUBRICATION PRACTICES | $4,974 | $0 | Implemented |
OK0291 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $356 | $480 | Not Implemented |
OK0291 # 06 Y:1989 | 06 | 1989 | INSTALL TURBULATORS | $1,310 | $2,450 | Not Implemented |
OK0291 # 07 Y:1989 | 07 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $844 | $1,500 | Implemented |
OK0291 # 08 Y:1989 | 08 | 1989 | COVER OPEN TANKS | $360 | $955 | Not Implemented |
OK0291 # 09 Y:1989 | 09 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,262 | $100 | Implemented |