Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,111
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0047 # 12 Y:2024 | 12 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $292 | $800 | n/a |
MU0047 # 13 Y:2024 | 13 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,114 | $0 | n/a |
MU0047 # 14 Y:2024 | 14 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $61 | $264 | n/a |
MU0047 # 15 Y:2024 | 15 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $10,501 | $29,043 | n/a |
MU0047 # 16 Y:2024 | 16 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $72 | $174 | n/a |
MU0047 # 17 Y:2024 | 17 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,296 | $25,585 | n/a |
MU0047 # 18 Y:2024 | 18 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $589 | $1,046 | n/a |
MU0047 # 19 Y:2024 | 19 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,152 | $0 | n/a |
IC0304 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,108 | $0 | n/a |
IC0304 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $577 | $976 | n/a |
IC0304 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $335,865 | $2,216,227 | n/a |
IC0304 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,880 | $3,863 | n/a |
IC0304 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,066 | $4,623 | n/a |
IC0304 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,094 | $4,720 | n/a |
IC0304 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,023 | $0 | n/a |
IC0304 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,654 | $250 | n/a |
IC0304 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $32,173 | $3,405 | n/a |
LT8400 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,402 | $6,697 | n/a |
LT8400 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $749 | $4,772 | n/a |
LT8400 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,040 | $26,888 | n/a |
UU0248 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $980 | $2,600 | n/a |
UU0248 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,270 | n/a |
UU0248 # 03 Y:2024 | 03 | 2024 | USE AUTOMATIC FLOW CONTROL | $820 | $4,250 | n/a |
UU0248 # 04 Y:2024 | 04 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,420 | $319,250 | n/a |
UU0248 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,380 | $133,800 | n/a |